Add WhatsApp
E-mail:sales@adkosun.com
WhatsApp:+86 13379250593
Company news

Kosun Mud Separation Equipment Daxing Water Conservancy Project Construction

Pub Date:Apr 13, 2017    |    Views:76    |    

Chongqing Guanjingkou Reservoir is one of the 27 major water conservancy projects that the State Council has identified 172 major water conservancy projects. The "Government Work Report" calls for the construction of 27 major water conservancy projects in 2015. Guanjingkou water conservancy project consists of reservoir engineering and water supply project. The 7-stage non-pressure tunnel section of the project is put into two sets of micro-shield pipe jacking machine (Hai Ruike AVN2000 retractable type) for construction. The procurement of the two sets of mud separation system is the top of the pipe supporting equipment to ensure the normal jacking machine jacking work.

Mud-Separation-Equipment1.jpg

The project is the current domestic micro-shield project, using the international advanced construction technology and equipment, in order to ensure that with the Herrenknecht Shield machine stable operation.

Kosun provides two sets of KD-350 mud separation system for Its use. In this project:
1 Branch of the use of the city version of the design, to maximize the construction area to reduce the construction;
2 Vibration motor, flexible support fast, cyclone, etc. are used in a world-class products to ensure that the system is not running;
3 Provide customers with a long-term after-sales service, personal tracking project progress;
4 Its electronic control part is the first domestic intelligent APP remote monitoring and control system.

Mud-Separation-Equipment3.jpg

+86 13379250593 (WhatsApp/WeChat) sales@adkosun.com Online Service