Add WhatsApp
E-mail:sales@adkosun.com
WhatsApp:+86 13379250593
Company news

KD SERIES Slurry Separation System

Pub Date:Sep 26, 2017    |    Views:132    |    

KD series slurry separation system mainly consists of scalping shaker module, desanding module and desilting module. As a pre-screener, the scalping shaker can remove coarse particles from mud. The desanding module is equipped with desander (primary cyclones) and fine-mesh shaker and mainly removes granulated sand. The desilting module is equipped with desilter (secondary cyclones) and can conduct a fine separation selectively according to the field needs of customers.


Mud closed-loop circulating purification mode and lower water content in slags help reduce the environmental pollution.


Wear parts of the system are of anti-corrosion and wear-resistance, long service life and low failure rate, and the system can be suitable for various severe working conditions.


Slurry Separation System


Overall Advantages Of KD SERIES Slurry Separation System:

-Simple and useful treatment process, as well as convenient installation, operation and maintenance;

-Modular and integrated design, transportation and installation subject to standard container size, foldable operating platform, compact structure, small footprint and flexible field use;

-Adjustable G-force of shale shaker, screen panel angle and mesh size, strong overall system adaptability and easier treatment of materials from various formations;

-Meet separation requirements on various materials and customize process as per the cut point of D 50 ; meet the requirements on different handling capacities, 100~3000m³/h;

-Meet various power specifications as per construction needs, and even generator set can be used for operation;

-The whole system is skid-mounted integrated system and can be also changed into vehicle-mounted mobile treatment unit.


Application of KD SERIES Slurry Separation System:

Besides slurry balanced shield, construction mud is mainly generated by the construction of the following projects:

1. Bored pile foundation construction mud- generated by rotary drilling rig, positive and reverse circulation drill and percussion drill during drilling and pore forming;

2. Underground diaphragm wall construction mud-generated by diaphragm wall and double wheels trench cutter during trenching;

3. Trenchless construction mud- generated by horizontal directional drilling and slurry pipe jacking. (Editor:Kosun Lily.Wang)


+86 13379250593 (WhatsApp/WeChat) sales@adkosun.com Online Service